Pipe Laser Setup Checker

A pipe-laser setup and independent-check record with an optional worksheet: design invert = start + signed grade × chainage, beam RL = invert + declared offset.

100% FreeRuns in your browserIntermediate

Project and review scope

A setup and independent-check record for one pipe-laser reach, plus an optional predicted invert and beam worksheet. It does not replace the instrument manual, set the laser or certify the pipe; tolerances are yours.

Predicted beam and invert worksheet (optional)

Invert(x) = start invert + signed grade × x; beam RL = invert + declared beam offset. Negative grade = falls as chainage increases. Your laser manual governs the setup itself.

m
Blank = percent.
m
m
m
m
mm
Blank = residuals listed, not judged.
Laser beam above the pipe invert
Not to scale — vertical exaggerated
Laser beam above the pipe invertSide view of a pipe invert with the laser beam parallel above it, a target at a chainage, the beam offset and the horizontal chainage dimensioned.Increasing chainageLaser beamStart invert RL₀TargetoffsetInvert at xx (horizontal)
Chainage increases left to right. The laser beam runs parallel to the design invert at a declared offset; the target reads the beam, not the invert.
  • Note: A target height is not an invert RL: invert = beam RL − beam offset, and the offset must be declared.
  • Problem: Grade direction not declared — state whether the pipe falls or rises as chainage increases.

Review status: Not reviewed

Review progress 0 of 17 applicable rows verified (0%)

Outstanding critical findings

  • Grade direction not declared — state whether the pipe falls or rises as chainage increases.
  • Setup invert / reference RL checked — Not started
  • Benchmark source independently checked — Not started
  • Increasing chainage and signed grade declared — Not started
  • Laser beam offset distinguished from pipe invert — Not started

Review rows

Design data

0/1 verified
  • Design invert levels and grade to hand

Reference level

0/2 verified
  • Setup invert / reference RL checked

    Critical

  • Benchmark source independently checked

    Critical

Alignment and direction

0/3 verified
  • Chainage and direction confirmed

  • Line set to design alignment

  • Increasing chainage and signed grade declared

    Critical

Laser setup and grade

0/3 verified
  • Laser level and stable

  • Grade dialled to design

  • Mounting stability recorded (base, trench box, manhole)

Target and beam offset

0/3 verified
  • Target height matches laser height

    The target reads the beam, not the invert — record the beam offset above invert separately.

  • Laser beam offset distinguished from pipe invert

    Critical

  • Target orientation and centring checked

Independent checks

0/3 verified
  • Independent check of grade over a known length

  • First pipe(s) checked against invert

  • Independent observed-minus-design residual recorded

Disturbance and recalibration

0/2 verified
  • Re-check after any knock or move

  • Instrument manual and calibration reference recorded

Add your own row

Keep, share and print

Nothing leaves your browser. Saving on this device is optional and only happens when you press it.

Before you rely on this: First-pass guide only. Verify safety-critical or regulated work against the relevant standards, your project requirements and a qualified professional.

Tip: Enter any known values to calculate the remaining results.

Designed to run locally in your browser. Tool inputs are not intentionally stored by Zerdly unless stated otherwise.