Stockpile Blend Planner
Work out the blended grade of a ROM stockpile from its lots — mass-weighted, on a wet or dry basis, with the grade coverage shown next to every result so a partly-assayed pile never reads like a measured one.
What this does
Enter your lots and it gives you the blended grade of the pile — mass-weighted, on a wet or dry basis, with the coverage shown next to every result so a partly-assayed stockpile never reads like a measured one. It also draws the pile down pro rata for a reclaim, and solves how much of a source you can add before a grade target is breached.
It does not yet read tonnes and grades off a dispatch screen by itself. The screen capture test further down is how that gets built: run it against a real display for an hour and it records exactly what is legible there, which is what a reader has to be written against.
Blend check
Mass-weighted grades over the lots you enter. An unassayed lot adds its tonnes without touching that attribute's average — it lowers the coverage instead, and the coverage is shown next to every grade.
| Lot | Wet t | Moisture % | Dry t | Li₂O % | Fe % | Row |
|---|---|---|---|---|---|---|
Leave an assay blank when there is no result. A blank is not a zero, and a measured 0 should be typed as 0.
Blended result
- Total dry tonnes
- 810
- Lots
- 3
Li₂O %
1.12estimate from 92.6% of the tonnes
750 t of 810 t carry a result. The unassayed tonnes are in the total but not in this average, so the real blend could sit either side of it.
No result: Lot C.
Fe %
0.4296whole blend assayed
Reclaim and targets
Optional. Reclaim draws tonnes off every lot in proportion, which is the honest model for a pile that was never homogeneous — so the modelled grades do not move, only the tonnes.
Enter the source tonnes and at least one target to see how much can be added.
Checked one attribute at a time against the blend as shown above. A limit computed from a partly-assayed blend inherits that blend's coverage, so read it with the coverage figures.
Screen capture test
Point this at the dispatcher display, leave it running, then export what it saw. It reads the whole frame and records every word it finds with its position, rather than looking in places someone has guessed at — which is what decides how the rest of this tool has to work.
Nothing is uploaded. The recogniser is served from this site and runs in this tab; frames are drawn to a canvas and discarded. The export file is the only thing that leaves this machine, and you choose when that happens.
Written into the export so two runs can be told apart.
Can be changed while it runs. Faster is not better: recognition takes a second or two, and the gaps are recorded either way.
Labels on a map are usually small, so 2x is the one to start with. Enlarging costs speed but finds text that is otherwise invisible to the recogniser; 3x is the slowest.
How to use this calculator
- Enter each lot as a row: a name, its tonnes, and whatever assays you have.
- Give tonnes either way — type dry tonnes directly, or type wet tonnes with a moisture percentage and the dry figure is worked out for you and labelled as derived.
- Leave an assay blank when there is no result. A blank is not a zero, and it will not drag the average down — it lowers the coverage instead.
- Type 0 only when zero is what the lab actually reported.
- Choose whether to weigh grades on dry or wet tonnes.
- Read each grade with the coverage line underneath it, which says how much of the pile that number actually speaks for.
- Optionally enter a reclaim tonnage to draw the pile down pro rata, and a source plus a grade target to see how much more can be added before the target is breached.
How it works
A blended grade is a mass-weighted average, not a plain one. Each lot contributes its tonnes multiplied by its grade; the sum of those products divided by the tonnes gives the blend. A 600 tonne lot at 1.00% and a 150 tonne lot at 1.60% blend to 1.12%, not to the 1.30% a straight average of the two numbers would suggest.
The denominator is the tonnes that actually carry a result, never the total. This is the distinction that matters most on a real pad. Add 60 tonnes with no lithium assay to that 750 tonne blend and the estimate stays at 1.12% while the coverage falls to 750 of 810 tonnes, or 92.6%. Dividing by the full 810 instead would report 1.04% — a number that looks measured, is not, and would send ore to the wrong destination.
Coverage is reported with every grade for that reason. An estimate drawn from a quarter of the tonnes is not the same kind of number as one drawn from all of them, and the tool will not print the first as though it were the second. Where a lot has no known tonnage in the chosen basis there is no total to divide by at all, and the result says basis incomplete rather than inventing one.
Basis is part of the identity, not a display setting. Dry-basis weights use dry tonnes; wet tonnes convert with wet x (1 - moisture/100) and back with dry / (1 - moisture/100), and a moisture figure outside 0 to 100 is refused rather than assumed. Tonnage coverage is tracked separately from grade coverage, because a lot can have a good assay and no known dry tonnage.
Reclaim is modelled as proportional depletion across every lot, which is the honest model for a pile that was never physically homogeneous — nobody knows which lot the loader actually bit into. Because every lot shrinks by the same factor, the modelled grades and the coverage do not move; only the tonnes do.
Target limits are solved exactly rather than by trial and error. For a minimum bound L on an attribute, adding x tonnes of a source at grade g holds the bound while numerator + x·g is at least L x (weight + x), which rearranges to a single ceiling on x. A source above the bound lifts the blend and is unconstrained; one below it has a finite limit. Maximum bounds are the same algebra with the comparison reversed.
Lithium and Li2O, iron and Fe2O3, and two different moisture conventions are treated as separate quantities throughout. The tool will not convert one into another, because that conversion depends on assumptions a site has to approve rather than a calculator can make.
Worked example
Three lots, one of them unassayed. Lot A is 600 dry tonnes at 1.00% Li2O and 0.50% Fe. Lot B is 150 dry tonnes at 1.60% Li2O and 0.20% Fe. Lot C is 60 dry tonnes with 0.30% Fe and no lithium result yet. A and B alone blend to 750 tonnes at 1.12% Li2O and 0.44% Fe. Adding Lot C gives 810 tonnes: the iron becomes 348/810 = 0.4296%, because every lot has an iron result, while the lithium estimate stays at 1.12% and its coverage drops to 750/810 = 92.6%. Now reclaim 90 tonnes pro rata. The pile falls to 720 tonnes and both grades and the coverage stay exactly where they were — proportional depletion changes the quantity, not the composition.
Common mistakes
- Typing 0 for an assay that has not come back. Zero is a measurement and will be averaged in; leave the box empty instead.
- Averaging the grades without weighting them by tonnes — two lots at 1.00% and 1.60% do not blend to 1.30% unless they happen to be the same size.
- Dividing by the total tonnes instead of the assayed tonnes, which reports a diluted figure as though it were measured.
- Mixing wet and dry tonnages in the same column. Pick the basis first, and let the tool derive the other one.
- Reading a reclaimed remainder as a measured composition. Pro-rata depletion is a model of the pile, not a sample of it.
Tips
- Read the coverage before you act on the grade — a 1.12% estimate at 40% coverage is a different decision from the same number at 98%.
- Enter wet tonnes and moisture rather than a dry tonnage you worked out yourself, so the page shows which figures were derived.
- A grade target limit inherits the coverage of the blend it was computed from. If the pile is only part-assayed, the tonnage ceiling is an estimate too.
- When a result reads basis incomplete, the known weight is still shown — that is the honest figure to quote until the missing tonnage is resolved.
- If you run the screen capture test, give the screen a name. Two runs on two monitors are only comparable when you can tell which was which.
Frequently asked questions
What happens to a lot with no assay result?
Its tonnes count towards the total, and it is left out of that attribute's average. The grade stays where it was and the coverage falls. This is the opposite of treating a blank as zero, which would quietly pull the blend down and still report it as though every tonne had been measured.
What is grade coverage?
The share of the tonnes that actually carry a result for that attribute — known grade weight divided by total tonnes. At 100% the blend is measured throughout. At 92.6% it is an estimate from most of the pile, and the unassayed tonnes could sit either side of it. The figure is shown next to every grade so the two are never read apart.
Should I blend on a wet or a dry basis?
Use the basis the assay was reported on, which for most hard-rock grade control is dry. The tool keeps them separate rather than converting silently: enter wet tonnes with a moisture figure and it derives the dry tonnage and labels it as derived, so a figure that came from an assumed moisture is never mistaken for a weighed one.
Why does the reclaim not change the grade?
Because pro-rata reclaim takes the same proportion from every lot, so the composition of what remains is unchanged. That is a modelling choice, and an honest one for a pile that was built in layers and is dug by a loader that does not know where the boundaries are. It is an estimate of the remainder, not a measurement of it.
Can it read tonnes and grades off the dispatch screen?
Not yet, and it does not pretend to. What it does have is a screen capture test: it watches a display you choose, recognises the text on it entirely within your browser, records where each word sat and how confident the reading was, and exports that as one file. That export is what a reader has to be written against — the sample screens supplied for this kind of tool are tidy tables, while real dispatch displays are moving maps, and a reader built for the first would read nothing on the second.
Does the screen capture send anything anywhere?
No. The text recogniser is served from this site and runs in the page, frames are drawn to a canvas and discarded, and nothing is transmitted. Pictures of the screen are switched off by default, both while capturing and again when exporting, because a frame of a dispatch display is a photograph of a live site. The exported file is the only thing that leaves your machine, and you choose when that happens and whether it contains images.
Can I use this for a commercial settlement?
It is built for placement and grade-control decisions, not for settlement. The arithmetic carries about fifteen significant digits, which is far more than these quantities need, but settlement work wants exact decimal arithmetic and an audited trail rather than a browser calculation. Use it to decide where the next truck tips, and your assay certificates to decide what gets paid.
Does it convert lithium to Li2O?
No. Li and Li2O, and Fe and Fe2O3, are kept as separate quantities and nothing here converts between them. The conversion factor is simple arithmetic, but which convention a site reports on, and whether a conversion is allowed on a given attribute, is a decision that belongs to the site rather than to a calculator.
Is anything saved or uploaded?
No. Every figure stays in your browser, there is no server to send it to, and nothing is stored when you close the page. The same is true of the screen capture test.
Related tools
- Metal Recovery Calculator
- Concentrate Moisture & Dry Tonnage Calculator
- Assay Unit Converter
- Lithium, Li2O & LCE Conversion Calculator
- ROM Pad Capacity Calculator
- PPM Percent Converter
Explore more in Mining, Quarry, Earthworks, Drill & Blast.
Cite this tool
Zerdly. (2026). Stockpile Blend Planner. Retrieved from https://www.zerdly.com/tools/stockpile-blend-planner/
Tip: Enter any known values to calculate the remaining results.
Designed to run locally in your browser. Tool inputs are not intentionally stored by Zerdly unless stated otherwise.