EOM Survey Checklist Builder

A month-end mine survey review tracing quantities to cut-offs, surfaces and density evidence, with an optional volume × your-density tonnage check and reconciliation gates.

100% FreeRuns in your browserProfessional

Project and review scope

A month-end survey review record tracing reported quantities to cut-off times, surfaces and density evidence. It does not compute volumes from surfaces, read spreadsheets or supply densities; a tonnage figure is only your volume × your density.

Optional tonnage and reconciliation check

Tonnes = closing volume × YOUR density. Leave density blank for a volume-only result — no density is assumed. A reconciled label also needs a reported total and matching cut-off, datum and wet/dry basis.

m³
t/m³
From your site's density records; basis is set in the project fields.
t
%
Blank = difference reported, not judged.
  • Note: Enter a closing volume for the optional tonnage check.

Review status: Not reviewed

Review progress 0 of 25 applicable rows verified (0%)

Outstanding critical findings

  • Survey cut-off timestamp and timezone aligned — Not started
  • Opening and closing surface versions recorded — Not started
  • Opening and closing surfaces on the same vertical datum — Not started
  • Density source and wet or dry basis recorded — Not started

Review rows

Active pits

0/2 verified
  • All active areas surveyed

  • As-built vs design captured

Stockpiles

0/2 verified
  • Stockpiles and ROM pads picked up

  • Per-stockpile evidence recorded (add a row per stockpile)

    Use “Add your own row” for each stockpile with its pickup file, time and toe/crest boundary.

Dump changes

0/1 verified
  • Dump and waste-dump changes picked up

Survey control and cut-off

0/3 verified
  • Control checked before pickup

  • Survey cut-off timestamp and timezone aligned

    Critical

  • Acquisition timestamp recorded for every pickup

Surface boundaries

0/4 verified
  • Surfaces built and checked for holes

  • Method and boundaries documented

  • Opening and closing surface versions recorded

    Critical

  • Opening and closing surfaces on the same vertical datum

    Critical

Triangulation exclusions

0/2 verified
  • Inaccessible areas and exclusions recorded

  • Triangulation exclusions and long-edge trimming documented

Density provenance

0/2 verified
  • Densities / swell factors applied

    From your site's documented density and swell work — none is supplied here.

  • Density source and wet or dry basis recorded

    Critical

Volume and tonnage reconciliation

0/3 verified
  • Volumes computed (cut / fill / stockpile)

  • Survey vs plan / claimed compared

  • Reported totals imported or entered — not assumed

Variance explanations

0/3 verified
  • Variances explained

  • Reviewed with engineering / geology

  • Variance explanations and reviewer recorded

Issued report archive

0/3 verified
  • EOM report and plans issued

  • Data archived and backed up

  • Carry-forward actions recorded for next month

Add your own row

Keep, share and print

Nothing leaves your browser. Saving on this device is optional and only happens when you press it.

Before you rely on this: First-pass guide only. Verify safety-critical or regulated work against the relevant standards, your project requirements and a qualified professional.