CRS Job Setup Checklist

Checks coordinate reference system setup for datum, projection, zone, GDA2020, MGA, AHD and geoid.

100% FreeRuns in your browserIntermediate

CRS definition

e.g. GDA94 → GDA2020 by the published grid, with its stated accuracy. No offset is applied by this page.

Source → operation → target: ? → no transformation recorded → ?. Assigning a CRS label, reprojecting coordinates and transforming between datums are three different operations.

Independent check point

Definition

Horizontal datum (and epoch if dynamic) recordedcritical

Projected CRS / EPSG and zone recordedcritical

Vertical datum and height type recordedcritical

Units confirmed in the CRS and the softwarecritical

Operations

Where metadata was only ASSIGNED, the data really is in that CRS

Reprojection between CRSs documented (from → to)

Datum transformation method and its stated accuracy documented

Geoid model loaded and matches the datum

Software and data

Controller / GIS project CRS matches this recordcritical

Control coordinates are in this CRS

Verification

Independent check point observed and within tolerancecritical

Readiness

Not ready

0 of 11 applicable items assessed (0% complete). Completeness is not readiness.

Critical items not passed

  • Horizontal datum (and epoch if dynamic) recorded
  • Projected CRS / EPSG and zone recorded
  • Vertical datum and height type recorded
  • Units confirmed in the CRS and the software
  • Controller / GIS project CRS matches this record
  • Independent check point observed and within tolerance

Still to assess (11)

  • Horizontal datum (and epoch if dynamic) recorded
  • Projected CRS / EPSG and zone recorded
  • Vertical datum and height type recorded
  • Units confirmed in the CRS and the software
  • Where metadata was only ASSIGNED, the data really is in that CRS
  • Reprojection between CRSs documented (from → to)
  • Datum transformation method and its stated accuracy documented
  • Geoid model loaded and matches the datum
  • Controller / GIS project CRS matches this record
  • Control coordinates are in this CRS
  • Independent check point observed and within tolerance

Records stay on your device as files you choose to save. The page keeps nothing.

A complete checklist is not a certificate that the CRS is right — the independent check point is the evidence.

How the method works

Assessed is not the same as ready
Illustrative method
Assessed is not the same as readyFive checklist items, all assessed; one critical item failed. The assessment bar is full while readiness shows not ready.Instrument and units recordedPassSetup and target heightsPass★ Orientation checkFailDrone sectionN/A — reason givenSketch and notesPassAssessed 5 of 5ReadinessNOT READY — ★ critical failed
Every item has been assessed (5 of 5, 100 %), but the critical orientation check failed, so the record is NOT ready. Completeness counts assessed items; readiness needs every critical item to pass, no unresolved blockers, and a reason for each N/A.

Fixed example values for illustration — not your result.

Tip: Enter any known values to calculate the remaining results.

Designed to run locally in your browser. Tool inputs are not intentionally stored by Zerdly unless stated otherwise.