Pre-mobilisation Risk Checklist

A before-departure readiness record with remote, roadside and live-plant triggers that keep answers when hidden, and permits and comms tests exposed.

100% FreeRuns in your browserBasic

Project and review scope

A before-departure readiness record for one mobilisation. Condition triggers add the questions for remote, roadside and live-plant work; hiding them keeps their answers. It is not a risk score, a permit or an approval to work.

Condition triggers and excluded questions

Set Remote site, Roadside work and Live plant nearby in the project fields. Questions for a condition appear when it is Yes; switching it back hides them but keeps every answer and evidence note, and the table below says why each one is excluded. Critical permit and communication-test rows stay in the outstanding list until verified.

  • Check: Remote site: not answered — its questions stay hidden until you choose Yes.
  • Check: Roadside work: not answered — its questions stay hidden until you choose Yes.
  • Check: Live plant nearby: not answered — its questions stay hidden until you choose Yes.

Questions excluded by the current conditions (answers kept)

Questions excluded by the current conditions (answers kept)
QuestionWhy it is excluded
Traffic management plan or road-reserve permit in placeRoadside work is not selected
Fuel, water and recovery gear for remote travelRemote site is not selected
Exclusion zones and spotter arranged for live plantLive plant nearby is not selected
Satellite communication device tested before departureRemote site is not selected
Plant operator communication protocol agreedLive plant nearby is not selected
Check-in schedule and overdue procedure agreedRemote site is not selected

Review status: Not reviewed

Review progress 0 of 18 applicable rows verified (0%)

Outstanding critical findings

  • Permits and approvals obtained — Not started
  • Site access and permits verified — Not started
  • Communication and check-in plan tested — Not started
  • Outstanding departure blockers reviewed — Not started

Review rows

6 row(s) do not apply to the project settings above; they are hidden but kept in the record.

Site access and permits

0/3 verified
  • Site induction / access arranged

  • Permits and approvals obtained

    Critical

  • Site access and permits verified

    Critical

Competency and induction

0/1 verified
  • Crew competency / training current

Vehicle inspection

0/1 verified
  • Vehicle pre-start inspection completed

Plant and services hazards

0/4 verified
  • Known site hazards reviewed

  • Traffic / plant interaction planned

  • Services / exclusion zones identified

  • Condition-specific hazards and controls reviewed

Weather and terrain

0/2 verified
  • Travel and remoteness considered

  • Weather and heat plan

PPE

0/1 verified
  • PPE and safety gear packed

First aid

0/1 verified
  • First-aid and nearest help located

Communication tests

0/2 verified
  • Communications and check-in plan

  • Communication and check-in plan tested

    Critical

Emergency plan

0/1 verified
  • Emergency contacts and procedure

Equipment checks

0/1 verified
  • Survey equipment checked and calibration current

Documentation and check-in

0/1 verified
  • Outstanding departure blockers reviewed

    Critical

Add your own row

Keep, share and print

Nothing leaves your browser. Saving on this device is optional and only happens when you press it.

Before you rely on this: First-pass guide only. Verify safety-critical or regulated work against the relevant standards, your project requirements and a qualified professional.

Tip: Enter any known values to calculate the remaining results.

Designed to run locally in your browser. Tool inputs are not intentionally stored by Zerdly unless stated otherwise.